Skip links and keyboard navigation

Skip to primary navigation | Skip to secondary navigation | Skip to content | Skip to content | Skip to footer | Use tab and cursor keys to move around the page (more information)
Skip Navigation LinksDepartment of Housing and Public Works > Facilities management > Facilities for government > Office Accommodation Management Framework > Guideline 2: Space > 6.0 HPW management of office space

 6.0 HPW management of office space

6.1 Responsibility

The Department of Housing and Public Works (HPW) is responsible for the development and implementation of innovative strategies for the provision, management and utilisation of suitable, cost-effective office accommodation that supports agencies' service delivery needs.

6.2 Portfolio

The portfolio of office accommodation managed by the Department of Housing and Public Works includes space in:

  • government-owned office buildings
  • ‘Major Leased’ buildings (leased wholly or in substantial part by government)
  • ‘Other Leased’ buildings (including buildings procured through a pre-commitment lease process).

The Department of Housing and Public Works undertakes office space management on both strategic and operational levels.

A strategic approach is taken for longer-term (2-5years) office accommodation planning and project implementation in the Brisbane CBD and 18 strategically significant regional centres. These 18 centres are identified in Guideline 1: Planning.

An operational approach is generally taken for current-year office requirements in Brisbane and the 18 regional centres referred to above, and also in other regional centres that are smaller and have a relatively stable office accommodation demand.

6.3 Management objectives

The management objectives for the Department of Housing and Public Works are to:

  • maximise the utilisation of government office buildings
  • maintain a reasonable balance between owned and leased office space
  • minimise the overall vacancy rate within the portfolio
  • improve the overall quality of government office accommodation
  • reduce the overall cost of government office accommodation consistent with quality improvement
  • support individual agencies' office space needs
  • maximise whole-of-Government savings and benefits.

6.4 The space management process

The process of managing government office space is integrated with the process of managing government office-building assets, as described in Guideline 1: Planning.

Office space management in the Brisbane CBD and all regional centres is undertaken as a series of separate exercises because agencies' office accommodation requirements are generally specific to each centre. Agencies' requests to relocate between centres are managed as required.

In the Brisbane CBD and the 18 strategically-significant centres, the Department of Housing and Public Works:

  • establishes the office accommodation requirements of each agency in each centre and aggregates these areas to establish the total space demand in the current year, 2-3 years out and 5 years out
  • establishes the increase or decrease in demand and the timeframe
  • assesses the opportunities for functional alignment between agencies and other levels of government and service delivery partners within a region
  • assesses the space available, or to become available, in government office buildings (HPW and agency owned)
  • assesses the status of current leased space (functional suitability, condition, landlord performance, remaining lease term, rent review opportunities, etc.)
  • assesses the status and performance of the local property market including leasing opportunities
  • confirms the functional suitability of space available to meet agencies' needs
  • consults with agencies to confirm requirements
  • develops a strategy that integrates the various space requirements into an interlinked series of projects that meet agencies' needs for additional space, reduced space, relocations, collocations and vacation of unsuitable space
  • negotiates and acquires new leased space or lease extensions in existing buildings in the marketplace as required
  • negotiates and acquires new leased space under pre-commitment lease arrangements if no suitable premises are available in the marketplace
  • undertakes the ongoing processes of building management (for government-owned buildings) and lease management (for all leased buildings)
  • undertakes the ongoing tenancy management and financial management processes
  • conducts ongoing premises inspection programs and tenant liaison programs
  • upgrades government-owned office buildings to enhance functionality as needed
  • confirms to agencies' the rental commitment required under the strategy
  • confirms and formalises the funding arrangements for the strategy project funding (including contributions from the Office Accommodation Program)
  • implements the series of projects that form the overall strategy
  • evaluates the process and the strategy's outcome.

The Department of Housing and Public Works undertakes the above office space management process as a continuous, rolling program. The consultation process with agencies is extensive and ongoing.

In other, smaller regional centres, the management of office space by the Department of Housing and Public Works is based on a consultation process and on agencies' specific requests. The sensitivity and viability of the local property markets in these centres is also considered as part of the process.

6.5 Acquisition of leased office space from the property market

The Department of Housing and Public Works negotiates, acquires and manages office space leased from the private sector property market on behalf of agencies. The requirement for leased space is established through the strategic office accommodation planning and management process and through ongoing consultation with agencies.

When a need for leased office space has been established, the Department of Housing and Public Works investigates and analyses supply in the local property market in that particular centre and assesses the suitability and availability of office space based on a number of factors including location, functionality, amenity, statutory and regulatory compliance, environmental and sustainability aspects, rental and other occupancy costs, and agencies' special requirements.

Acting under each agency's instructions, the Department of Housing and Public Works will identify the most suitable alternative and negotiate with the owners and/or their agents to reach an agreement with respect to all of the commercial terms and conditions on a Without Prejudice basis. All terms and conditions are subject to acceptance by the agency and approval by the Minister for Housing and Public Works to enter into a legally binding lease transaction. The Department of Housing and Public Works will not proceed to a legally binding relationship with an owner and/or agent unless and until both agency approval and approval by the Minister for Housing and Public Works (or his delegate) have been obtained.

An agency's agreement to accept and occupy leased space requires from the agency:

  • a Fitout Project Approval submission if the fitout cost exceeds $100 000, regardless of the funding source. The lease acquisition should not proceed until this submission is approved
  • written acceptance of a submission from the Department of Housing and Public Works for each new lease entitled New lease proposal (PDF, 75KB) - Client approval and financial commitment (please refer to supporting document) which contains:
    1.a full recital of the terms and conditions of the proposed new lease including rental and other occupancy costs, and review or cost escalation methodologies
    2.a commitment by the agency to meet all expenses for the full term of the lease
    3.a commitment by the agency to comply with all legal provisions within the lease agreement
    4.acceptance of Department of Housing and Public Works' lease negotiation fees, lease establishment fees (principally consisting of legal fees), and ongoing lease management fees. Lease negotiation fees and lease management fees are approved by Cabinet, and legal fees are oncharged at actual cost
    5.agency approval of the terms and conditions and instructions to proceed on its behalf.

Once the completed New lease proposal (PDF, 75KB) - Client approval and financial commitment is returned from the agency, the Department of Housing and Public Works will seek approval from the Minister for Housing and Public Works (or his delegate) to enter into a legally binding contract with the building owner or agent.

Office accommodation leases are entered into by the State of Queensland represented by the Department of Housing and Public Works. The Department of Housing and Public Works is the lessee in a legal sense.

6.6 Acquisition of leased space through pre-commitment to lease

When a need for leased space has been identified, but the local property market cannot provide suitable space from existing stock, the possibility of acquiring the necessary space through pre-commitment lease process can be considered. This space can be provided in a newly constructed building, in a refurbished building or in a building that has been extended to provide the space.

If the Department of Housing and Public Works identifies this process as the preferred option, and the potential tenant agency agrees, then a lease pre-commitment project can be initiated. These projects are managed by the Department of Housing and Public Works on behalf of the proposed tenant agency or agencies on a fee for service basis.

The process involves at least five stages:

  1. Extensive consultation with the agency's end user of the space to develop a Base Building Brief (PDF, 280KB) for pre-commitment lease of space from the private sector (Please refer to supporting documents). This stage is critical because the new premises will be purpose built to suit the agency's needs.
  2. A call to the marketplace for Expressions of Interest to deliver the accommodation as described in a project Building Brief which defines the minimum built-environment standards that must be met.
  3. Evaluation of responses and short-listing of the most suitable proposals.
  4. Identifying the preferred option, and entering into negotiations with that proponent on a Without Prejudice basis to reach agreement under all headings for the provision of the new accommodation.
  5. Implementation of normal new lease acquisition procedures as described in ‘6.5 Acquisition of leased office space from the property market’.

Additional evaluation stages may be required to reach the preferred proponent/developer, particularly for large or special use facilities. The process involves a structured approach with probity risks effectively managed and documented. The process also involves extensive consultation between the Department of Housing and Public Works and the proposed tenant agency or agencies, together with their technical and fitout consultants.

The proposed building and accommodation must be technically acceptable to the Department of Housing and Public Works and acceptable to the end-user tenant agency or agencies, both functionally and financially The Department of Housing and Public Works uses its Base Building Brief (PDF, 280KB) to ensure that these requirements are met agencies that are to occupy the building must provide formal financial commitments and approvals, and obtain Fitout Project Approval as mentioned in section ‘6.5 Acquisition of leased office space from the property market’ and described in section ‘6.8 Fitout Project Approval process’.

Office accommodation pre-commitment leases are entered into by the Department of Housing and Public Works as lessee. Occupying agencies must comply with the agreed lease conditions.

6.7 Lease management

Cabinet has approved that the Department of Housing and Public Works shall manage all new and existing government office accommodation leases except where other arrangements are already in place. Leases are entered into by the Department of Housing and Public Works as lessee except in very specific cases where the lessee will be the occupying agency.

Lease management includes:

  • all consultation with the property market
  • arranging technical inspections as required
  • lease negotiations
  • lease acquisition and establishment
  • instructing solicitors in the preparation of lease agreements and other legal documents
  • exercising options
  • rent review negotiations including instructing valuers as required
  • negotiating lease extensions, lease terminations, variations, sub leases and assignments
  • dispute-resolution negotiations
  • financial management
  • tenancy management
  • premises inspection programs
  • landlord and/or agent interaction
  • 'make good' negotiations.

The Department of Housing and Public Works, in its role in a legal sense, is responsible for the financial management of leases, including making accurate and timely lease payments to landlords and/ or agents in accordance with the lease provisions, and recovering lease charges from tenant agencies. The Department of Housing and Public Works uses its Tenancy Management System (TMS) for lease management, invoicing and payments. The TMS is interfaced with Queensland Treasury's SAP financial management system.

A general description of the operation of the TMS and agencies' access to the system is described in section ‘7.2 Tenancy Management System (TMS)’.

6.8 Fitout Project Approval process

The Fitout Project Approval process is managed by the Department of Housing and Public Works in conjunction with the Department of the Premier and Cabinet. The process was initiated by the Department of the Premier and Cabinet and is mandatory for all agencies.

The purpose of this process is to monitor and review agencies' office accommodation fitout projects to ensure that these projects are consistent with the intent of the Office accommodation workspace and fitout standards (PDF, 695KB) and meet appropriate space and cost performance benchmarks. The process operates in a consultative way and provides for the Department of Housing and Public Works to review project proposals against benchmarks and consult with agencies to achieve an efficient and cost-effective outcome.

This process comprises two stages and uses a template for submission of the project proposal. Submission for stage one approval should be considered as early as reasonably possible in the project program to avoid non-productive design and documentation work if changes are necessary. When agencies are acquiring leased space, stage one of the submission forms part of the lease acquisition process and stage one approval needs to be obtained before the government becomes bound to proceed with the lease acquisition.

Stage one of the Fitout Project Approval process incorporates assessment and approval procedures for projects in three project cost ranges as follows:

  • agency-funded projects up to an estimated project cost of $100 000 may be self-assessed by the  agency that is proposing the project
  • projects up to an estimated cost of $100 000, and funded wholly or partly through the Office Accommodation Program, are assessed and approved by the Department of Housing and Public Works
  • projects with an estimated project cost from $100 000 to $250 000 are assessed and approved by the Department of Housing and Public Works
  • projects with an estimated project cost over $250 000 are assessed by the Department of Housing and Public Works in consultation with the agency submitting the proposal. When the project is considered to be consistent with the intent of the Office accommodation workspace and fitout standards (PDF, 695KB) and meets appropriate space and cost performance benchmarks, the Department of Housing and Public Works submits the proposal to the Department of the Premier and Cabinet for consideration. The project will be approved or returned for further consultation, revision and resubmission.

Apart from preliminary design fees, no project expenditure should be committed until stage one approval is obtained.

Projects with an estimated cost over $250 000 also require a second stage (final) approval prior to commencement of construction. This approval is given only if the final (fixed) project cost is not more than 10 per cent above the initial estimated cost. For building owner approvals within Government Owned Buildings, also refer to Guideline 4: Occupancy for sustainability requirements listed within the building user guide template.

The Approval procedure for government office accommodation projects (PDF, 409KB) is a supporting document of Guideline 3: Fitout.

6.9 Accommodation provided for community-based organisations

In certain circumstances, the Department of Housing and Public Works can assist community-based organisations to acquire and occupy space in government-owned buildings.

The opportunities for this assistance are limited to space that is currently surplus to requirements or is unsuitable for use by agencies. Any such space can be made available only for the period that this space is not required for government use or until the building is required for redevelopment or disposal.

There are assessment criteria for such organisations seeking space and generally, preference is given to non-commercial (not-for-profit) organisations. Each request is treated on a case by case basis and occupancy is subject to specific conditions that must be agreed to by the occupying organisation. Rental and other occupancy costs are subject to negotiation.

Additional information is available from the Department of Housing and Public Works.



Last updated 16 August 2012    Creative Commons Attribution 4.0 International (CC BY 4.0)


Copyright |  Disclaimer |  Privacy |  Right to information |  Accessibility |  Jobs in Queensland |  Other languages

© The State of Queensland – Department of Housing and Public Works 2009–2017

Queensland Government