Display AQ0262019

For more detailed information on a particular section refer to the help specific to that section.

Times presented in this website are for Queensland (without daylight saving).

Detailed Help (Clicking detailed help will open a new browser window)
Invitation to EOI-Central Energy Plant Cooling Towers Expansion Project, Principal Design Team

Issued by Corporate Administration Agency

Expression of Interest

Status: Shortlisted
Mega Category: Building construction and maintenance
Number: AQ0262019
Released: Mon, 13 May 2019 at 12:00AM Brisbane, Queensland
Closing: Tue, 28 May 2019 at 2:00PM Brisbane, Queensland
UNSPSC: Building and Construction and Maintenance Services - (100%)
Region/s: South East Queensland

Section 1

Tender Overview

INVITATION FOR EXPRESSION OF INTEREST - Central Energy Plant Cooling Towers Expansion Project, Principal Design Team

The State of Queensland represented by the Department of Environment and Science acting through Arts Queensland (AQ) invites Expressions of Interest (EOI) from pre-qualified consultants (Level 3) for the commission of a Principal Design Team to provide design services for the Central Energy Plant Cooling Towers Expansion Project (the Project).

The Principal Design Team (PDT) will be an Architectural firm providing all design services:

  • directly as Architect for the project (ensuring the principal’s obligation towards moral rights);
  • and indirectly, by the engagement of all necessary secondary and specialist design consultants required to complete the scope of work.

The PDT will coordinate and have overall responsibility for the work and performance of all secondary and specialist design consultants and for the effective integration of all design outputs. The terminology Principal Design Team describes the whole of the team (Architect and secondary consultants) undertaking the design role for the Project.

This Invitation to EOI will be undertaken as a two-stage tendering process as follows:

  • Stage 1:  EOI, Evaluation & Shortlist (this EOI process) – EOI responses will be evaluated in accordance with the EOI Evaluation Criteria detailed below and consultants short listed accordingly.  The number of short listed consultants is at the absolute discretion of AQ.
  • Stage 2:  Invitation to Offer (ITO process) – AQ’s ITO documentation will be forwarded to the shortlisted consultants for submission of a detailed Offer to undertake the Principal Design Team (PDT) design services for the Central Energy Plant Cooling Towers Expansion Project (the Project).

For detailed information on the specific Services sought under this EOI, please review the "Specification Documents" in "Section 3 - Here is the detail".

Mandatory Requirement: Consultants must be on the PQC Eligible List; that is Pre-qualfication system (PQC) registered (minimum Level 3).

More about tendering here

Section 2

Still need help? Contact Us

Enquiries
users Mignonette Le Riche
phone 30032274
email caaprocure@caa.qld.gov.au

Section 3

Here is the detail

If there are no documents listed in this section, please refer to Section 1 Tender Overview.

Documents can not be downloaded once Tender has closed.